Port Graves public dock at Camp Artaban
- Landing
A regional district public dock with posted loading, temporary moorage and emergency zones.
Before you go
-
The district marks its dock floats with painted zones: red for temporary loading and unloading, yellow for temporary moorage of up to 24 hours, and white for emergency services only. Moorage is limited to 24 hours unless the regional district posts otherwise. Nothing, including a watercraft, may be stored on the dock surface outside a posted storage area.
-
The land at the head of the bay is Camp Artaban, a private institutional site in the island community plan. The dock is the regional district's; the camp takes its own group bookings.
-
The Port Graves dock monitor reported in December 2025 that the dock is in good condition and the float is often crowded, with limited moorage space.
Sources (8)
-
[1] Docks, Sunshine Coast Regional District
-
[2] Gambier Island Conservancy Hiking Trail Map (October 2024)
-
[3] Gambier Island Local Trust Committee
Gambier Island Official Community Plan Bylaw No. 73, 2001, consolidated December 17, 2019
-
[4] Camp Artaban
-
[5] Important Pre-trip Information, Cormorant Water Taxi
-
[6] Sunshine Coast Regional District
Ports Monitors (POMO) Committee Meeting agenda package, May 5, 2026
-
[7] Amenities, Camp Artaban
-
[8] Accomodations, Camp Artaban